DMRC Vacancy Delhi Metro Post Recruitment Result 2020




Post Name

DMRC Vacancy Delhi Metro Post Recruitment Result 2020

Information About Post

Delhi MetroDelhi Metro Rail Corporation DMRC, Delhi Are Recently Uploaded Result for the Various Post Recruitment 2019. Those Candidate Are Enrolled with Vacancies and Appeared in the CBT Exam Can Check the Result here.




DMRC Vacancy Delhi Metro Rail Corporation Limited 

DMRC Delhi Metro Various Post Recruitment 2019 Result

DMRC/HR/RECTT./I/2019  Details of Notification

www.govindiajobs.in

Important Dates

  • Application date : 14/12/19
  • Last Date for Apply Online : 20/01/2020
  • Exam Fee Last Date : 20/01/2020
  • Exam Date is on : February 2020
  • Answer Key Available on : 28 February to 04 March 2020
  • Result Available on : 07/04/2020

Application Fee

  • General / OBC / EWS : 500/-
  • SC / ST / PH : 250/-
  • All  Female Category : 250/-
  • Pay the Exam Fee via Debit Card
  • Online Credit Card
  • Online Net Banking
  • Online E Challan

Age Limit as on 01/12/2019 for DMRC Vacancy

  • Minimum Age Limit : 18 Years.
  • Maximum Age Limit : 28 Years for Post Code (CNE-01,02,03,05,06)
  • Maximum Age Limit : 30 Years (All Other Post)

Total DMRC Vacancy Details 2020

        1492 Posts 
Code
Post Name
Gen
EWS
OBC
SC
ST
Total
Eligibility of DMRC Vacancy
RE01 Assistant Manager (Electrical) 07 01 05 02 01 16 Engineering Degree BE / B.Tech with 60% Marks in Related Stream / Post with Two Years’ Experience
RE02 Assistant Manager (S&T) 06 0 0 02 01 09
RE03 Assistant Manager (Civil) 05 01 03 02 01 12
RE04 Assistant Manager (Operation) 05 0 01 01 02 09 Engineering Degree BE / B.Tech /MBA with 60% Marks in Related Trade with Two Years’ Experience
RE05 Assistant Manager (Architect) 02 0 01 0 0 03 Bachelor Degree in Architecture with 60% Marks in Related Trade and Two Years’ Experience
RE06 Assistant Manager (Traffic) 01 0 0 0 0 01 Master Degree in Mathematics / Statistics / Economics / Transport Planning / BE / B.Tech with 60% Marks in Related Trade and Two Years’ Experience
RE07 Assistant Manager (Stores) 03 0 01 0 0 04 Engineering Degree BE / B.Tech with 60% Marks in Related Trade with Two Years’ Experience
RE08 Assistant Manager (Finance) 01 0 0 0 02 03 CA / ICWA with Two Years’ Experience
RE09 Assistant Manager (Legal) 02 0 01 0 0 03 Bachelor Degree in Law (LLB) with 2 Year Experience.
RNE01 Junior Engineer (Electrical) 11 02 0 11 02 26 Three Year Diploma in Engineering in Related Trade.
RNE02 Junior Engineer (Electronics) 27 06 09 11 13 66
RNE03 Junior Engineer (Civil) 25 05 15 07 07 59
RNE04 Junior Engineer (Environment) 05 0 02 01 0 08
RNE05 Junior Engineer (Stores) 04 0 01 0 0 05
RNE06 Fire Inspector 03 0 02 01 01 07 Bachelor Degree in Science B.Sc with One Year Fire Safety Course
RNE07 Architect Assistant 03 0 01 0 0 04 Diploma in Architecture
RNE08 Assistant Programmer 11 02 04 04 02 23 Bachelor Degree BCA / B.Sc / Diploma with 60% Marks in Related Trade with 2 Years’ Experience
RNE09 Legal Assistant 04 0 0 01 0 05 Bachelor Degree in Law LLB with 50% Marks
RNE10 Customer Relation Assistant (CRA) 187 38 57 58 46 386 Bachelor Degree in Any Stream with Computer Application Course
RNE11 Accounts Assistant 21 04 13 08 02 48 Bachelor Degree B.Com with 2 Years’ Experience
RNE12 Stores Assistant 05 0 02 01 0 08 Engineering Diploma / B.Sc in Related Trade with 2 Years’ Experience
RNE13 Assistant / CC 03 0 01 0 0 04 Post Graduate Diploma / Graduation in Journalism Mass Communication
RNE14 Office Assistant 04 0 03 01 0 08 Bachelor Degree BA / B.Sc / B.Com with 2 Years’ Experience
RNE15 Stenographer 06 0 03 0 0 09 Bachelor Degree in Any Stream with One Year Course in Office Management and Secretariat Practice English Shorthand 80 wpm / English Typing 40 wpm
RNE16 Maintainer Electrician 49 10 14 28 0 101 ITI in Related Trade from Any Recognized University / Institute
RNE17 Maintainer Electronic Mechanic 86 14 0 0 44 144
RNE18 Maintainer Fitter 17 01 0 0 0 18
CE01 Assistant Manager Electrical 01 0 0 0 0 01 Engineering Degree BE / B.Tech with 60% Marks in Related Trade with Two Years’ Experience
CE02 Assistant Manager S&T 09 01 03 02 02 17
CE03 Assistant Manager IT 05 0 01 01 0 07 MCA / BE / B.Tech with 60% Marks in Related Trade with Two Years’ Experience
CE04 Assistant Manager Civil 30 07 20 09 07 73 Bachelor Engineering Degree BE / B.Tech with 60% Marks in Related Trade and Two Years’ Experience
CE05 Assistant Manager Finance 05 0 02 01 0 08 CA / ICWA and Two Years’ Experience
CNE01 Junior Engineer Electrical 54 12 27 17 10 120 Engineering Three Year Diploma in Related Trade
CNE02 Junior Engineer Electronics 58 12 24 17 14 125
CNE03 Junior Engineer Civil 81 13 16 19 10 139
CNE04 Assistant Programmer 01 0 0 0 0 01 Bachelor Degree BCA / B.Sc / Diploma with 60% Marks in Related Trade and Two Years’ Experience
CNE05 Architect Assistant 06 01 02 01 0 10 Diploma in Architecture
CNE06 Assistant / CC 03 0 0 0 0 03 Bachelor Degree / PG Diploma in Journalism & Mass Communication




Important Links for DMRC Vacancy

 

Download Result (Post Code Wise)
RE01 | RE02 | RE03 | RE04 | RE05 |

 RE06RE07 | RE08 | RE09 | CE01 | 

CE03 | CE02 | CE04 | RNE01 | RNE02

RNE04 | RNE05 | RNE07 | RNE08

Download Result (Other Post)

Available Soon

Download Answer Key

Click Here

Download Notice for Answer Key

Click Here

Download Admit Card

Click Here

Download Post Wise Exam Date Link

Click Here

Apply Online Link

Click Here

Login for Already Registered Link 

Click Here

Date Extended Notice Link

Click Here

Download Notification Link

Click Here

Official Website Link

Click Here
About Delhi Metro DMRC Vacancy

Delhi Metro

The Delhi Metro has been instrumental in ushering in a new era in the sphere of mass urban transportation in India. The swanky and modern Metro system introduced comfortable, air conditioned and eco-friendly services for the first time in India and completely revolutionized the mass transportation scenario not only in the National Capital Region but the entire country.

Having constructed a massive network of about 389 Km with 285 stations (including NOIDA-Greater NOIDA Corridor and Rapid Metro, Gurugram) in record time in Delhi, NCR, the DMRC today stands out as a shining example of how a mammoth technically complex infrastructure project can be completed                                                                                      before time and within budgeted cost by a Government agency. 




The Delhi Metro Rail Corporation Limited (DMRC) was registered on 3rd May 1995 under the Companies Act, 1956 with equal equity participation of the Government of the National Capital Territory of Delhi (GNCTD) and the Central Government to implement the dream of construction and operation of a world- class Mass Rapid Transport System (MRTS).
The DMRC opened its first corridor between Shahdara and Tis Hazari on 25th December, 2002. Subsequently, the first phase of construction worth 65 kilometres of Metro lines was finished two years and nine months ahead of schedule in 2005. Since then the DMRC has also completed the construction of another 125 kilometres of Metro corridors under the second phase in only four and a half years.Presently, the Delhi Metro network consists of about 389 Km with 285 stations.
The network has now crossed the boundaries of Delhi to reach NOIDA and Ghaziabad in Uttar Pradesh, Gurgaon, Faridabad, Bahadurgarh and Ballabhgarh in Haryana. With the opening of the Majlis Park to Shiv Vihar and Janakpuri West – Botanical Garden Sections, new age trains equipped with the Unattended Train Operation (UTO) technology have been introduced.
These trains operate with the Communication Based Train Control(CBTC) signaling technology which facilitate movement of trains in very short frequencies.
This network also includes the NOIDA – Greater NOIDA Aqua Line. The Aqua Line has been constructed by DMRC on behalf of the NOIDA Metro Rail Corporation and is also being operated by DMRC currently. In addition, the 11.6 kilometre long Rapid Metro also connects with the Delhi Metro network at Sikanderpur station of Yellow Line.
The Rapid Metro provides connectivity within the satellite city of Gurugram.The Airport Express link between the Indira Gandhi International Airport and New Delhi has now propelled Delhi to the league of global cities which have high speed rail connectivity between the city and the airport.
The DMRC today has over 300 train sets of four, six and eight coaches.The Delhi Metro has also contributed tremendously on the environment front by becoming the first ever railway project in the world to claim carbon credits for regenerative braking.
DMRC has also been certified by the United Nations (UN) as the first Metro Rail and Rail based system in the world to get carbon Credits for reducing Green House gas emissions as it has helped to reduce pollution levels in the city by 6.3 lakh tons every year thus helping in reducing global warming.It has also set up roof top solar power plants at many of its stations.
All stations of the presently under construction corridors are being constructed as green buildings. In the present phase of Delhi Metro’s construction, the DMRC has completed 160 kilometres of Metro lines which has woven a web of Metro corridors along the city’s Ring Road besides connecting with many other localities in NOIDA, Ghaziabad, Bahadurgarh and Ballabhgarh.Apart from providing Delhites with a comfortable public transport option, the Delhi Metro is also contributing significantly towards controlling pollution as well as reducing vehicular congestion on the roads. for more details please visit official website for DMRC Vacancy in 2020.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top